Lead time analyzer for mavim process mining
Lead time analyzer for mavim process mining The Lead time analyzer by Mavim Process Mining -- KA-01589
The Lead time analyzer by Mavim Process Mining allows to analyze lead time between two process steps.
Configure the visual
This is the icon of the The Lead time Analyzer in the visualizations pane in Power BI:
To use the Multi Field Slicer visual you need to build up the visual and drag the relevant data field into their respective buckets.
Build the visual
Functionalities
The Lead Time Analyzer by Mavim Process Mining is used to show lead times between two specific events. You can choose between a view which is more like a kpi and one with an additional bar chart showing the breakdown by duration and variants.
Filtering
In order to show the calculated duration and the breakdown by duration and variants in the bar chart you need to select two activities. First select the start activity in the left input and the end activity in the right input. After you selected both the duration will get calculated.
Within the select input you can type and search for activities. You don't need to scroll through the list in order to find the activity you want to select.
To delete the selection you need to click on the X within either the left or right input. Afterwards the selection will be cleared and you can select new activities.
Display Settings
In this submenu you can adjust the settings regarding the selection menu; font sizes and colors.
Data label
In the Data label settings submenu; you can adjust the default display settings for the Data label.
Category label
Settings for the Category label.
Activity label
Settings for the Activity labels.
Bart chart
Bar chart Settings for the bar chart
X axis
Settings for the X axis of the bar chart; will only be shown; if the bar chart is active.
Y axis
Settings for the Y axis of the bar chart; will only be shown; if the bar chart is active.